Hammerschmid, Pachl, Seebacher - Architekten
Stoaninger Mühlviertel Destillation
2010
Lembach im Mühlkreis
Bauzeit: 12 Monate
The building is situated in the north of Austria, in the middle of an isolated narrow valley. The Shape of the ground plan is influenced by the regional building regulations and the existing slope. Moreover the design follows natural limitation given by the adjacent river. The main idea of the project is to create one homogeneous sculpture for both distillery and living areas, opposing the existing building in an abstract way. According to the characteristics of landscape the roof of the building is coated by facade material, using untreated rough sawn regional wood.
Lembach im Mühlkreis
Bauzeit: 12 Monate
The building is situated in the north of Austria, in the middle of an isolated narrow valley. The Shape of the ground plan is influenced by the regional building regulations and the existing slope. Moreover the design follows natural limitation given by the adjacent river. The main idea of the project is to create one homogeneous sculpture for both distillery and living areas, opposing the existing building in an abstract way. According to the characteristics of landscape the roof of the building is coated by facade material, using untreated rough sawn regional wood.